Raycap News

A huge win for integrated 5G streetlight poles

A large wireless infrastructure customer handed off a challenging request: design and deliver streetlight poles with integrated small cells to support its 5G rollout in Miami. Just how tough was this project?

  • Multi-operator, multi-node 4G/5G support
  • All radios, electronics, and cabling inside
  • 170mph maximum wind load
  • Thermal engineered for tropical heat
  • Precise color and finish requirements
  • Exact match with existing foundations
  • Install before Superbowl 2020!

Read how our multi-disciplinary team and fast-turn manufacturing made the right plays in this case study.

Download case study