A large wireless infrastructure customer handed off a challenging request: design and deliver streetlight poles with integrated small cells to support its 5G rollout in Miami. Just how tough was this project?
- Multi-operator, multi-node 4G/5G support
- All radios, electronics, and cabling inside
- 170mph maximum wind load
- Thermal engineered for tropical heat
- Precise color and finish requirements
- Exact match with existing foundations
- Install before Superbowl 2020!
Read how our multi-disciplinary team and fast-turn manufacturing made the right plays in this case study.